Welcome to PAKITWORLD!
I hope you will find PAKITWORLD forum useful...
Welcome to PAKITWORLD!
I hope you will find PAKITWORLD forum useful...
Would you like to react to this message? Create an account in a few clicks or log in to continue.



 
HomeSearchLatest imagesLog inRegister
Search
 
 

Display results as :
 
Rechercher Advanced Search
Freelancer.com
Visitors
Live Trafic
CS605 Quiz Software Engineering 2 Pageviews=1

 

 CS605 Quiz Software Engineering 2

Go down 
AuthorMessage
Admin
Admin



Posts : 216
Join date : 2011-06-17
Location : Rawalpindi

CS605 Quiz Software Engineering 2 Empty
PostSubject: CS605 Quiz Software Engineering 2   CS605 Quiz Software Engineering 2 EmptyTue Jun 28, 2011 8:22 pm

Quiz1 CS605


Solved By (IMRAN AHMAD QUESHI)


Vision phase in a software process focuses on __________.
Select correct option:
What
Why
How
Change


______________ model has a major drawback in that the delivered product may not fulfill the customer's requirements.
Select correct option:
Water fall
Build and Fix
Prototyping
Integrated water fall and prototyping


MOI model of leadership stands for
Select correct option:
Motivation , Operationalize ,Integration
Misunderstanding , Object, Ideas
Motivation , Organization, Innovation
Miscommunication ,Organization, Invention

The _____________ model is
used to overcome issues related to understanding and capturing of user
requirements.
Select correct option:
Rapid Prototyping
Water fall
Build and Fix
None of the above

:
Water fall model is a document driven model.
Select correct option:
True
False

The Waterfall Model is a documentation-driven model:
Spiral model has _____________ dimensions.
Select correct option:
2
3
4
None of the above


The______________ model of software development is a useful approach when a customer cannot define requirements clearly.
Select correct option:
Prototyping
Water fall
RAD
Build and Fix

_____________________ phase in a software process focuses on change.
Select correct option:
Vision
Maintenance
Definition
Development


____________activity is performed throughout software production
Select correct option:
Maintenance
Development
Analysis
Quality Assurance

__________________paradigm, structures a team loosely and depends on individual initiative of the team members
Select correct option:
Closed
Random
Open
Synchronous

: In ________________ model the product is developed without any proper design and specifications.
Select correct option:
Water fall
Build and Fix
Prototyping
None of the abov


model is a haphazard type of software development activity.
Select correct option:
Water fall
Incremental
Prototyping
Build and Fix +++

Rapid application development is another form of _________________.
Select correct option:
Incremental model
Prototyping model
Linear Sequential model
None of the above

software project management focuses on the four P’s: These are
Select correct option:
People , Product , Process , Problem
People , Product , Process
, Project
People , Passion , Process ,
Project
People , Passion , Planning , Project


:
___________ model of software development is a good approach when core product is required quickly.
Select correct option:
Incremental
Linear Sequential
Prototyping
None of the above

: The _______________ dimension in rational unified process model represents the dynamic aspect of the process.
Select correct option:
Horizontal
Angular
Vertical
Regular


model is developed keeping in mind the element of risk in the development of software
Select correct option:
Spiral
RAD
Incremental
Synchronize and Stabilize

_______________ model is adopted by Microsoft
Select correct option:
RAD
Build and Fix
Spiral
Synchronize and Stabilize

_______________ model is adopted by Microsoft
Select correct option:
RAD
Build and Fix
Spiral
Synchronize and Stabilize


In ________________ model the product is developed without any proper design and specifications.
Select correct option:
Water fall
Build and Fix
Prototyping
None of the above


____________________ teams generate more and better solutions than
individuals
and are most useful for complex problems

Select correct option:
Decentralized
Centralized

: ________________ model is adopted by Microsoft
Select correct option:
RAD
Build and Fix
Spiral
Synchronize and Stabilize

: In _________________, there is both vertical and horizontal communication.
Select correct option:
Controlled decentralized
(CD)
Democratic decentralized
(DD)
Controlled centralized (CC)
Synchronous paradigm (SP)


In _________________, there is both vertical and horizontal communication.
Select correct option:
Controlled decentralized (CD)
Democratic decentralized (DD)
Controlled centralized (CC)
Synchronous paradigm (SP)

: The _____________ model is used to overcome issues related to understanding and capturing of user requirements.
Select correct option:
Rapid Prototyping
Water fall
Build and Fix
None of the above


The _______________ dimension in rational unified process model represents the dynamic aspect of the process.
Select correct option:
Horizontal
Angular
Vertical
Regular


_____________dimension of Spiral model represents the cumulative cost to date
Select correct option:
Radial
Angular


: Rapid application development is another form of _________________.
Select correct option:
Incremental model
Prototyping model
Linear Sequential model
None of the above

Rolling Eyes Rolling Eyes Rolling Eyes


Back to top Go down
https://pakitworld.board-directory.net
 
CS605 Quiz Software Engineering 2
Back to top 
Page 1 of 1
 Similar topics
-
» GDB CS605 Software Engineering II (Spring2011)
» CS504 Quiz (Software Engineering-I) Quiz#1
» CS605 Quiz 4
» ENG201 Quiz (Business and Technical English Writing) {Quiz#1}
» ENG201 Quiz (Business and Technical English Writing) [Quiz#1]

Permissions in this forum:You cannot reply to topics in this forum
 :: MCS/BCS/MIT/BIT/BSCS :: Computer Science :: CS605 Software EngineeringII-
Jump to: